Wink News

Project Name

Wink News

Location

Fort Myers

Services

Concrete Cutting

Description

SCOPE OF PROJECT: Demolish and remove existing parapet wall sections approximately 25 feet above finished floor (AFF) using wall saw, lull, and boom lift equipment.

OUR BIGGEST CHALLENGE: The most difficult aspect of this project is the constant coordination required to remove the parapet walls safely and efficiently. While our crew leader operates the track-guided wall saw, an additional technician must be in close proximity to each section during the cutting process. This technician is responsible for continually monitoring weight distribution as the saw rips through the base of the wall and for communicating real-time feedback to the crew below, who are preparing to lift and dispose of each section.