
Project Name
Evangelical Church
Location
Naples
Services
Selective Demo and Structural Shoring
Description
Biggest Challenge:
Cutting and removing a steel beam required precise execution. The crew used a torch to safely control every cut while keeping the structure stable.
The End Result
The steel beam came down safely and precisely. Sidewalks and columns were removed with the same level of control. Every brace & shoring post was installed to keep the load above supported. Complex work was handled cleanly, efficiently, and safely.






